CHAPTER Lab 1200  BOILERS AND PRESSURE VESSELS

 

Statutory Authority:  RSA 157-A:3 through RSA 157-A:8

 

REVISION NOTE:

 

Document #5371, eff 4-10-92, made extensive changes to the wording, format, structure, and numbering of rules in Chapter Lab 1200.  Document #5371 supersedes all prior filings for the sections in this chapter.  The prior filings for former Chapter Lab 1200 include the following documents:

 

#1537, eff 2-20-80

#2515, eff 10-25-83

#4019, eff 3-21-86 EXPIRED 3-21-92

 

PART Lab 1201  DEFINITIONS

 

Lab 1201.01  "Existing boiler and pressure vessel installation" as used in RSA 157-A: 5 means any boiler or pressure vessel constructed, installed, placed in operation or contracted for before 1967.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

          Lab 1201.02  “Hot water supply boiler” as used in RSA 157-A: 8, II (c) and RSA 157-A: 8, II (d) means a boiler used to heat water for purposes other than space heating.

 

Source.  #11071, eff 4-11-16

 

          Lab 1201.03  “Hot Water heater” as used in RSA 157-A: 6, III (g), RSA 157-A: 6, III IV and RSA 157-A: 8, II (c) means a vessel in which potable water is heated by the combustion of fuel, by electricity, or by and other source, and withdrawn for external use.

 

Source.  #11071, eff 4-11-16

 

PART Lab 1202  INCORPORATION BY REFERENCE

 

Lab 1202.01  Boiler and Pressure Vessel Code of the American Society of Mechanical Engineers, 2015 Edition.  Under the authority of RSA 157-A: 3, boilers and pressure vessels, as defined in RSA 157-A: 2, shall conform to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, 2015 edition, as specified in Appendix II.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

Lab 1202.02  National Board Inspection Code, 2015 Edition,  Parts 2 & 3.  Under authority of RSA 157-A: 3, boilers and pressure vessels, as defined in RSA 157-A: 2, shall be inspected in accordance with the National Board Inspection Code, Part 2, Inspections and Part 3, Repairs and Alterations 2015 edition, as specified in Appendix II, including 1999 EN 303-5 for biomass burning boilers.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

PART Lab 1203  ADMINISTRATION

 

Lab 1203.01  Tagging.  A group of low pressure boilers, operating as a single unit with a common header and with no isolation valves, shall be considered as one unit for registration purposes only and tagged with one New Hampshire jurisdiction identification number.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

Lab 1203.02  Repairs and Alterations.  All repairs and alterations to boilers and pressure vessels shall be made in accordance with the National Board Inspection Code adopted under Lab 1202.02.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

Lab 1203.03 Request for Extension of Certificate Inspection Period.

 

(a)  Under RSA 157-A: 8, II (h), an owner as defined in RSA 157-A: 2, I who requests an extension of the period of time beyond the expiration of the grace period, under RSA 157-A: 8, II (g), shall make such request in writing to the commissioner prior to the expiration of the grace period.

 

(b)  The request, made pursuant to (a), above, shall include the specific reason for the request and the specific length of time requested.

 

(c)  The request shall include a written statement by the current inspector who is authorized to inspect the boilers and/or pressure vessels and who holds a current license issued by the commissioner under RSA 157-A: 7.

 

(d)  The written statement by the inspector provided in accordance with (c), above, shall certify that the length of time requested will not jeopardize the safety of the general public.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

Lab 1203.04  Extension Granted.

 

(a)  The commissioner shall grant the request for extension, provided that the requirements of Lab 1203.03 (b), (c) and (d) are met and that the commissioner determines that the additional period of time will not jeopardize the safety of the general public.

 

(b)  Once an extension of time is granted, written notification by the commissioner shall be issued to the individuals who requested the extension.

 

(c)  Under RSA 157-A: 8, II (g) no boiler or pressure vessel shall be operated beyond the 2 month grace period without having received an extension as requested under Lab 1203.03.

 

Source.  (See Revision Note at chapter heading for Lab 1200) #5371, eff 4-10-92, EXPIRED: 4-10-98

 

New.  #7210, eff 2-28-00; ss by #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

Lab1203.05  Licensing and Fees.

 

(a)  The commissioner shall issue a license to any person who qualifies for the license under the provisions of RSA 157-A: 7, I, as applicable, and these rules upon payment of the non-refundable fee.

 

(b)  A renewal fee pursuant to RSA 157-A: 7, II, as applicable, shall be charged upon application for renewal license providing that the application is filed within 30 calendar days from expiration date.

 

(c)  The fee for a re-instatement of a revoked or expired license shall be the same fee as the initial application fee.

 

(d)  The licensee shall notify the commissioner in writing of any change in status of employment or address of such licensee within 15 days such change takes place.

 

Source.   #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

Lab 1203.06  Revocation of License.

 

(a)  Any license issued under RSA 157-A: 7, III shall be revoked by the department, after notice and an opportunity for a hearing if:

 

(1)  The licensee violated any statute, rule or code adopted thereunder relative to boilers or pressure vessels;

 

(2)  The licensee falsified any documentation submitted to the department of labor; or

 

(3)  The licensee’s National Board commission becomes inactive for any reason.

 

(b)  Upon revocation, the department shall notify the holder of the effective date thereof.

 

(c)  The licensee shall, upon notification of the date of revocation, comply by surrendering the license to the commissioner.

 

(d)  Except as provided in (e) below, if the licensee fails to appear at a hearing, the department shall enter a default judgment and revoke the licensee's license after 7 calendar days from the date of the scheduled hearing.

 

(e)  If the department determines, based upon information supplied in writing by the licensee within 7 calendar days of the originally scheduled hearing, that the licensee had good cause for failing to appear at the hearing and a new hearing shall be scheduled, the default judgment shall not be entered or shall be lifted. Good cause shall include illness, accident, the death of a family member, or similar problem beyond the control of the licensee.

 

(f)  No one shall perform inspections pursuant to RSA 157-A: 7 and these rules after the revocation of their license.

 

Source.   #9076, eff 1-24-08; ss by #11071, eff 4-11-16

 

APPENDIX

 

RULE

STATUTE

 

 

Lab 1201.01

RSA 157-A: 3 and 157-A: 5

Lab 1201.02

RSA 157-A:8 II (c) and 157-A:8 II (d)

Lab 1201.03

RSA 157-A: 6 III (g), 157-A: 6 IV and 157-A:8 II (c)

Lab 1202.01

RSA 157-A: 3, 157-A: 4 and 157-A: 5

Lab 1202.02

RSA 157-A: 3, 157-A: 4, 157-A: 5, 157-A: 7 and 157-A: 8

Lab 1203.01

RSA 157-A: 3 and 157-A: 8

Lab 1203.02

RSA 157-A: 3 and 157-A: 5

Lab 1203.03

RSA 157-A: 8

Lab 1203.04

RSA 157-A: 8

Lab 1203.05

RSA 157-A: 7

Lab 1203.06

RSA 157-A: 7

 

 

APPENDIX II

 

Rule

Title

Obtain at:

Lab 1202.01

The Boiler and Pressure Vessel Code of the American Society of Mechanical Engineers, 2015 Edition

This publication is available at the New Hampshire Department of Labor’s  library located at The Hugh J. Gallen State Office Park, 95 Pleasant St, Concord, NH, or it may be purchased at the following website: https://global.ihs.com/nbic.cfm The cost to purchase is $280.00 ($140,  part 2 and $140.00,  part 3).

Lab 1202.02

The National Board Inspection Code , Part 2, Inspections and Part 3, Repairs and Alterations, 2015 Edition

This publication is available at the New Hampshire Department of Labor’s  library located at The Hugh J. Gallen State Office Park, 95 Pleasant St, Concord, NH, Phone #: 271-2599; or, it may be purchased by at the following website: https://www.ihs.com/products/asme-bpvc-standards.html by section, or the entire Code at a cost of $13,630.