TITLE XII
PUBLIC SAFETY AND WELFARE

CHAPTER 155-E
LOCAL REGULATION EXCAVATIONS

Section 155-E:8

    155-E:8 Issuance of Permit. – If the regulator after the public hearing approves the application for a permit and determines it is not prohibited by RSA 155-E:4 it shall, upon receipt of an excavation fee determined by the regulator not to exceed $50 and the posting of a bond or other such surety with the municipal treasurer in an amount, as it requires, reasonably sufficient to guarantee compliance with the permit, grant a permit to the applicant for an excavation. A copy of the permit shall be prominently posted at the excavation site or the principal access thereto. A permit shall not be assignable or transferable without the prior written consent of the regulator. A permit shall specify the date upon which it expires. The regulator may include in a permit such reasonable conditions as are consistent with the purpose of this chapter and may include requirements for a permit for excavation which are more stringent than the standards set forth in this chapter including the provision of visual barriers to the excavation.

Source. 1979, 481:2. 1991, 310:22, eff. Aug. 23, 1991.